BOOKMARK this page:



clix - социальные закладки
Annual average rate of 2007:
1 USD ($ USD)   = 29.39 rub.
1 EUR (€)           = 41,42 rub.

Currencies exchange rates (as of 11.06.2010): 
1 USD ($ USD)  = 31.5742 rub.
1 EUR (€)          = 38.0217 rub.

15.01.2010  
Inflation
                      0.7% Изм. 0%
Gold and currency reserves        441.4 bln. USD
Oil Brent (ICE)         71.62
                          USD/ barrel
GDP               II квартал 2009 год 9 326,4 bln. Rub.
Exports            24,5 Изм 1,8 bln. USD
Imports           15.5 Изм. 1.6 bln. USD
Fixed asset
investments
   01.07.09г. 621,7 Изм. -49.4 bln. Rub.
Consumer price index
(as of 01.8 / 31.08.2009)
  100 Изм. 0% - for food
commodities
              99.1 Изм. - 1.5%
- for non-food
products
                   100.6 Изм. - 0.2%
- for paid services rendered to the population         100.4 Изм. - 0.4%
Forecast rates on                         
1 USD ($ USD) = rub.
1 EUR (€)          = rub.
Русский  /  English

Construction of 3-Star Hotel for 188 Berths

Detail overview
GENERAL INFORMATION
Region
Municipality, City, District
Svetlogorsk
Brief positioning of project
The proposed project is construction and operation of a hotel in Svetlogorsk-Otradnoye resort area. The construction site is in Svetlogorsk, 600 m from the sea. Functional structure of the facility: hotel rooms, swimming pool, saunas, spa, gym, bowling with bar, discotheque, restaurant, conference halls
PLOT
Site TYPE
Unoccupied land
Enterprise (organization) name — owner name
Administration of Svetlogorsk City District, OOO Sportivny Olimp
Legal address
77A, Kaliningradsky Ave., Svetlogorsk, Kaliningrad Region
Telephone
+7 (40153) 3-33-03
Property category of land and buildings
freehold
Extension options
yes
LOCATION
Restrictions
yes
Remoteness
Center of the constituent subject
1
OWN TRANSPORT FACILITIES
Communication type (motorway)
yes
Communication type (railway branch)
yes
Communication type (port, landing stage)
yes
Communication type (post/telecommunications
yes
PROJECT INVESTMENT COSTS
Concept development design
yes
Preparation of design and estimate documentation (
yes
Comment
Land plot for construction is formed.
Preparation of design and estimate documentation (
yes
Comment
The design is complete
Preparation of design and estimate documentation (
yes
Preparation of design and estimate documentation (
yes
Preparation of design and estimate documentation (
yes
Comment
Construction permit is present
Expert examination of design and estimate document
yes
Comment
Expert reports and permits have been obtained
Execution of construction and assembly works
yes
Comment
All works on construction of off-site and on-site networks (cables, TS, sewage, water piping, independent power supply) have been completed.
ECONOMIC INDICATORS
Требуемый объем инвестицийBorrowed resources (%)
100
Payback time, years
7

Back to the list of projects

Exhibition operator - FORMIKA
 

© Group of companies FORMIKA, 2007-2009.
Copying and use all parts of the site in any form is forbidden.