Detail overview
|
GENERAL INFORMATION
|
Region
|
|
Municipality, City, District
|
Kizel District
|
Brief positioning of project
|
The project objective is creation of a competitive all-season resort and tourist center satisfying the needs of tourists of Perm Territory and adjacent regions within the territory of Kizel District of Perm Territory. Features of the complex: number of rooms: 5,000 for 10,000 guests, number of mountain-skiing pistes: 60, concurrent accommodation up to 25,000 persons. Mt. Oslyanka is a unique place for hosting a center of that kind for several reasons:
1) Ecologically clean place;
2) Rich surrounding nature (flora and fauna);
3) Ability to provide a wide range of tourist services in summer and during the inter-season period (more than 30 sorts of leisure time activities and sports);
4) Presence of a river what simplifies construction of snow and water supply system;
5) Altitude of the complex is comfortable for human health (250 to 1119 m);
6) Big elevation changes (over 600 m);
7) Duration of winter season is 8 months from October to May, with good natural snow;
8) The mountain has a form of a ridge what allows to increase considerably the area for accommodation of pistes (up to 60 pistes);
9) Significant human resources in city of Kizel and adjacent territories;
10) Absence of such serious natural risks as avalanche danger;
11) Still growing need of Russian citizens for healthy way of life and sharp increase of active rest and sports fans.
|
PLOT
|
Site TYPE
|
Unoccupied land
|
Registered address of the site
|
Mt. Oslyanka, Kizel District, Perm Territory
|
Area
|
12000 ha
|
Property category of land and buildings
|
freehold
|
Extension options
|
yes
|
LOCATION
|
Nearest Industry and/or infrastructure objects
|
OAO Metafrax: remoteness of the complex from the nearest factory evidences good ecological condition of the site
|
Prom: Distance to them (km)
|
80
|
Adjacent objects
|
OAO Metafrax: remoteness of the complex from the nearest factory evidences good ecological condition of the site
|
Natural — Distance (km)
|
0 to 1 km
|
Adjacent residential buildings
|
no
|
Restrictions
|
no
|
Remoteness
|
Center of the constituent subject
|
300
|
Nearest Millionaire City
|
Perm
|
millionaire city — distance km
|
300
|
Municipality education building
|
Kizel
|
municipality — distance, km
|
60
|
Highways
|
local road Gubakha — Kizel, regional road Perm — Berezniki, transport corridor Moscow — Nizhny Novgorod — Perm — Ekaterinburg
|
highways — distance, km
|
60
|
Railways
|
Kizel
|
railways — distance, km
|
60
|
Airports
|
Perm, Bolshoye Savino
|
airports — distance km
|
300
|
River ports, landing stages
|
Perm, Perm-1
|
river ports, landing stages — distance, km
|
300
|
FACILITIES
|
Number of structures
|
0
|
OWN TRANSPORT FACILITIES
|
Communication type (motorway)
|
yes
|
Communication type (railway branch)
|
no
|
Communication type (port, landing stage)
|
no
|
Communication type (post/telecommunications
|
no
|
Suggestions for site use
|
creation of resort and tourist center
|
Additional information on site
|
Currently the issue of constructing the utility infrastructure (power supply, gas supply, motor road) is considered. These communications have to be laid \down from Kizel cit (60 km aqay).
|
PROJECT INVESTMENT COSTS
|
Concept development design
|
yes
|
Comment
|
The concept of Parma all-season resort and tourist center has been developed by OAO Gortekhproektpostavka (OOO Gorimpex), the contractor is Storyarkhitektura, the client is OAO Investment Promotion Agency.
|
Preparation of design and estimate documentation (
|
no
|
Preparation of design and estimate documentation (
|
no
|
Preparation of design and estimate documentation (
|
no
|
Preparation of design and estimate documentation (
|
no
|
Preparation of design and estimate documentation (
|
no
|
Expert examination of design and estimate document
|
no
|
Execution of construction and assembly works
|
no
|
Supervision of construction and assembly works
|
no
|
Financial consultants’ services
|
no
|
Repayment of interest on credit
|
no
|
Current project status
|
Search for project financing sources, resolution of issues concerning utility infrastructure construction
|
CONTRACTORS
|
General designer
|
ÎÎÎ "Gorimpex"
|
ECONOMIC INDICATORS
|
Revenue from sales of areas (RUR, millions)
|
12 700
|
Discount rate, %
|
15
|
NPV (RUR, millions)
|
3 300
|
Payback time, years
|
10,5
|
Discounted payback time, years
|
12,5
|
IRR , %
|
24
|