Annual average rate of 2007:
1 USD ($ USD)   = 29.39 rub.
1 EUR (€)           = 41,42 rub.

Currencies exchange rates (as of 11.06.2010): 
1 USD ($ USD)  = 31.5742 rub.
1 EUR (€)          = 38.0217 rub.

15.01.2010  
Inflation
                      0.7% Èçì. 0%
Gold and currency reserves        441.4 bln. USD
Oil Brent (ICE)         71.62
                          USD/ barrel
GDP               II êâàðòàë 2009 ãîä 9 326,4 bln. Rub.
Exports            24,5 Èçì 1,8 bln. USD
Imports           15.5 Èçì. 1.6 bln. USD
Fixed asset
investments
   01.07.09ã. 621,7 Èçì. -49.4 bln. Rub.
Consumer price index
(as of 01.8 / 31.08.2009)
  100 Èçì. 0% - for food
commodities
              99.1 Èçì. - 1.5%
- for non-food
products
                   100.6 Èçì. - 0.2%
- for paid services rendered to the population         100.4 Èçì. - 0.4%
Forecast rates on                         
1 USD ($ USD) = rub.
1 EUR (€)          = rub.
Ðóññêèé  /  English

Creation of All-Season Resort and Tourist Center “Parma” on Mt. Oslyanka in Kizel District of Perm Territory

Detail overview
GENERAL INFORMATION
Region
Municipality, City, District
Kizel District
Brief positioning of project
The project objective is creation of a competitive all-season resort and tourist center satisfying the needs of tourists of Perm Territory and adjacent regions within the territory of Kizel District of Perm Territory. Features of the complex: number of rooms: 5,000 for 10,000 guests, number of mountain-skiing pistes: 60, concurrent accommodation up to 25,000 persons. Mt. Oslyanka is a unique place for hosting a center of that kind for several reasons: 1) Ecologically clean place; 2) Rich surrounding nature (flora and fauna); 3) Ability to provide a wide range of tourist services in summer and during the inter-season period (more than 30 sorts of leisure time activities and sports); 4) Presence of a river what simplifies construction of snow and water supply system; 5) Altitude of the complex is comfortable for human health (250 to 1119 m); 6) Big elevation changes (over 600 m); 7) Duration of winter season is 8 months from October to May, with good natural snow; 8) The mountain has a form of a ridge what allows to increase considerably the area for accommodation of pistes (up to 60 pistes); 9) Significant human resources in city of Kizel and adjacent territories; 10) Absence of such serious natural risks as avalanche danger; 11) Still growing need of Russian citizens for healthy way of life and sharp increase of active rest and sports fans.
PLOT
Site TYPE
Unoccupied land
Registered address of the site
Mt. Oslyanka, Kizel District, Perm Territory
Area
12000 ha
Property category of land and buildings
freehold
Extension options
yes
LOCATION
Nearest Industry and/or infrastructure objects
OAO Metafrax: remoteness of the complex from the nearest factory evidences good ecological condition of the site
Prom: Distance to them (km)
80
Adjacent objects
OAO Metafrax: remoteness of the complex from the nearest factory evidences good ecological condition of the site
Natural — Distance (km)
0 to 1 km
Adjacent residential buildings
no
Restrictions
no
Remoteness
Center of the constituent subject
300
Nearest Millionaire City
Perm
millionaire city — distance km
300
Municipality education building
Kizel
municipality — distance, km
60
Highways
local road Gubakha — Kizel, regional road Perm — Berezniki, transport corridor Moscow — Nizhny Novgorod — Perm — Ekaterinburg
highways — distance, km
60
Railways
Kizel
railways — distance, km
60
Airports
Perm, Bolshoye Savino
airports — distance km
300
River ports, landing stages
Perm, Perm-1
river ports, landing stages — distance, km
300
FACILITIES
Number of structures
0
OWN TRANSPORT FACILITIES
Communication type (motorway)
yes
Communication type (railway branch)
no
Communication type (port, landing stage)
no
Communication type (post/telecommunications
no
Suggestions for site use
creation of resort and tourist center
Additional information on site
Currently the issue of constructing the utility infrastructure (power supply, gas supply, motor road) is considered. These communications have to be laid \down from Kizel cit (60 km aqay).
PROJECT INVESTMENT COSTS
Concept development design
yes
Comment
The concept of Parma all-season resort and tourist center has been developed by OAO Gortekhproektpostavka (OOO Gorimpex), the contractor is Storyarkhitektura, the client is OAO Investment Promotion Agency.
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Expert examination of design and estimate document
no
Execution of construction and assembly works
no
Supervision of construction and assembly works
no
Financial consultants’ services
no
Repayment of interest on credit
no
Current project status
Search for project financing sources, resolution of issues concerning utility infrastructure construction
CONTRACTORS
General designer
ÎÎÎ "Gorimpex"
ECONOMIC INDICATORS
Revenue from sales of areas (RUR, millions)
12 700
Discount rate, %
15
NPV (RUR, millions)
3 300
Payback time, years
10,5
Discounted payback time, years
12,5
IRR , %
24

Back to the list of projects