Detail overview
|
GENERAL INFORMATION
|
Region
|
|
Municipality, City, District
|
Khabarovsk
|
Brief positioning of project
|
Purpose of the Project: Creation of a highly profitable mountain-ski facility with a high level of service and a wide range of services capable to meet the needs and to attract tourists and sports fans both from Russia and the countries of Asia-Pacific region. A distinctive feature of the project is the unique geographic location in immediate proximity from the capital of the Far East, presence of the airport, railways, river shipping and collateral tourist infrastructure, which renders its attractive both to inhabitants of Khabarovsk (about 1 million residents) and to visitors.
|
PLOT
|
Site TYPE
|
Unoccupied land
|
Enterprise (organization) name — owner name
|
OOO Dersu
|
Legal address
|
2v Progressivnaya St., Khabarovsk
|
Telephone
|
(4212) 545-545, 545-444
|
e-mail
|
ski@mail.khv.ru
|
Contact Person (Full name)
|
Khlop, Sergey Vladimirovich
|
Office
|
Director of OOO Dersu
|
Telephone
|
(4212) 545-545, 545-444
|
contact person’s e-mail
|
ski@mail.khv.ru
|
Registered address of the site
|
The site is located on the northern slope of Big Khekhtsir ridge, 2700 m westwards from the 25th km mark of Vladivostok highway.
|
Area
|
375 ha
|
Property category of land and buildings
|
freehold
|
Extension options
|
yes
|
LOCATION
|
Adjacent objects
|
Mountains of Big Khekhtsir ridge, Big Khekhtsir nature reserve
|
Natural — Distance (km)
|
3-5
|
Adjacent residential buildings
|
3
|
Restrictions
|
no
|
Remoteness
|
Center of the constituent subject
|
15
|
Municipality education building
|
Khabarovsk
|
municipality — distance, km
|
15
|
Highways
|
Vladivostok Highway
|
highways — distance, km
|
2,7
|
Railways
|
Khabarovsk
|
railways — distance, km
|
30
|
Airports
|
Khabarovsk
|
airports — distance km
|
30
|
River ports, landing stages
|
Khabarovsk
|
river ports, landing stages — distance, km
|
30
|
FACILITIES
|
Number of structures
|
9
|
OWN TRANSPORT FACILITIES
|
Communication type (motorway)
|
yes
|
Communication type (railway branch)
|
no
|
Communication type (port, landing stage)
|
no
|
Communication type (post/telecommunications
|
no
|
Additional information on site
|
The site is not crossed by permanent roads, there are no power lines or other communications or structures. There are rocks in the southern part. The territory has two streambeds which are filled by rainwater and spring flood. The sit length from the north to the south is 3 km, the width from the west to the east is 1.650 km. The northern part of the site is covered with mixed forest with dense shrubby undergrowth and fallen trees. The southern part situated higher on the slope has less dense trees. In the summertime, solar rays reach the site from 9:00 AM, the sun sets at 21:00, daylight hours in the winter period are from 11:300 to 17:00. Prevailing wind direction is south-west. Average thickness of snow cover in February is 15 to 40 cm.
|
PROJECT INVESTMENT COSTS
|
Concept development design
|
yes
|
Comment
|
Completed.
|
Preparation of design and estimate documentation (
|
yes
|
Comment
|
The design has been prepared by Dersu in cooperation with Stemboat University, Colorado, USA.
|
Preparation of design and estimate documentation (
|
yes
|
Comment
|
Completed
|
Preparation of design and estimate documentation (
|
yes
|
Comment
|
Completed
|
Preparation of design and estimate documentation (
|
yes
|
Comment
|
In process of execution
|
Preparation of design and estimate documentation (
|
yes
|
Comment
|
In process of execution
|
Expert examination of design and estimate document
|
yes
|
Comment
|
In process of execution
|
Execution of construction and assembly works
|
no
|
Supervision of construction and assembly works
|
no
|
Financial consultants’ services
|
yes
|
Comment
|
Estimate documentation was audited by ALT-INVEST.
|
Repayment of interest on credit
|
no
|
Current project status
|
Search for investors
|
ECONOMIC INDICATORS
|
Accumulated cash-glow for shareholders (RUR, Milli
|
1350
|
Discount rate, %
|
15
|
Shareholders' own resources (%)
|
10
|
Òðåáóåìûé îáúåì èíâåñòèöèéBorrowed resources (%)
|
90
|
Payback time, years
|
3,5
|
Discounted payback time, years
|
3,9
|