BOOKMARK this page:



clix - ñîöèàëüíûå çàêëàäêè
Annual average rate of 2007:
1 USD ($ USD)   = 29.39 rub.
1 EUR (€)           = 41,42 rub.

Currencies exchange rates (as of 11.06.2010): 
1 USD ($ USD)  = 31.5742 rub.
1 EUR (€)          = 38.0217 rub.

15.01.2010  
Inflation
                      0.7% Èçì. 0%
Gold and currency reserves        441.4 bln. USD
Oil Brent (ICE)         71.62
                          USD/ barrel
GDP               II êâàðòàë 2009 ãîä 9 326,4 bln. Rub.
Exports            24,5 Èçì 1,8 bln. USD
Imports           15.5 Èçì. 1.6 bln. USD
Fixed asset
investments
   01.07.09ã. 621,7 Èçì. -49.4 bln. Rub.
Consumer price index
(as of 01.8 / 31.08.2009)
  100 Èçì. 0% - for food
commodities
              99.1 Èçì. - 1.5%
- for non-food
products
                   100.6 Èçì. - 0.2%
- for paid services rendered to the population         100.4 Èçì. - 0.4%
Forecast rates on                         
1 USD ($ USD) = rub.
1 EUR (€)          = rub.
Ðóññêèé  /  English

Construction of Passenger Transportation String System as per the Design of Yunitsky

Detail overview
GENERAL INFORMATION
Region
Municipality, City, District
Khabarovsk
Brief positioning of project
Investment Project Objectives: Implementation of the world’s first passenger transportation string system designed by Yunitsky (“String System”) in Khabarovsk city. First variant: Design of String System construction and operation on the route Dikopoltsev St. — Riverside Station, length: 2.6 km. Second variant: Design of String System construction and operation over Amur river, on the route Riverside Station — Kabelny Island, length: 1.9 km. Third variant: Design of first stage of String System construction and operation Incorporator the routes Dikopoltsev St. — Riverside Station and Riverside Station — Kabelny Island, total length: 4.5 km.
PLOT
Site TYPE
Unoccupied land
Enterprise (organization) name — owner name
Khabarovsk City Administration
Legal address
17 Dikopoltsve St., Khabarovsk 680000
Telephone
(4212) 30-68-85, 30-68-69
e-mail
dasiz@dasiz.kht.ru
Extension options
yes
LOCATION
Restrictions
yes
Remoteness
Center of the constituent subject
0
OWN TRANSPORT FACILITIES
Communication type (motorway)
yes
Communication type (railway branch)
yes
Communication type (port, landing stage)
yes
Communication type (post/telecommunications
yes
PROJECT INVESTMENT COSTS
Concept development design
yes
Comment
Design “Justification of Creating the String System Section” hs been prepared.
Preparation of design and estimate documentation (
no
Comment
Under development: design documentation for a two-track section of Macro String System on the route Dikopoltsev St. — Gogol St., length: 1 km.
ECONOMIC INDICATORS
Òðåáóåìûé îáúåì èíâåñòèöèéBorrowed resources (%)
100
Payback time, years
2,5

Back to the list of projects

Exhibition operator - FORMIKA
 

© Group of companies FORMIKA, 2007-2009.
Copying and use all parts of the site in any form is forbidden.