Detail overview
|
GENERAL INFORMATION
|
Region
|
|
Municipality, City, District
|
Barnaul
|
Brief positioning of project
|
From the structural point of view, the residential complex consists of two neighborhoods that are merged by a transportation network and principal pedestrian directions from the planning standpoint. The street network of the complex is organically coordinated with the Right-bank section and a transportation network of the central part of city by a double-lever road interchange.
1. The road interchange will discharge Barnaul from a traffic jams.
2. It is situated on the bank of Ob, a great Siberian river.
3. It is situated on waterlogged wastelands.
4. It is situated in the middle of power loads.
5. Economical appeal.
A new standard of living.
|
PLOT
|
Site TYPE
|
Unoccupied land
|
Enterprise (organization) name — owner name
|
Barnaul City Administration
|
Legal address
|
18 Lenin Ave., Barnaul, Altai Territory, 656099
|
Telephone
|
8-3852-39-33-39
|
e-mail
|
info@bar.alt.ru
|
Contact Person (Full name)
|
Gatilov, Yury Alexandrovich
|
Telephone
|
8-3852-627-827
|
contact person’s e-mail
|
info@barnaul-gi.ru
|
Registered address of the site
|
The site under review is situated in the Central District of Barnaul on Pomazkin island and is confined by the streambed and a channel of Ob. A bridge crossing over Ob divides the territory into northern and southern parts.
|
Area
|
1500 ha
|
Property category of land and buildings
|
freehold
|
Extension options
|
no
|
LOCATION
|
Nearest Industry and/or infrastructure objects
|
Barnaul river port
|
Prom: Distance to them (km)
|
2
|
Adjacent objects
|
Ob river
|
Natural — Distance (km)
|
0
|
Adjacent residential buildings
|
1
|
Restrictions
|
no
|
Remoteness
|
Center of the constituent subject
|
0
|
Nearest Millionaire City
|
Novosibirsk
|
millionaire city — distance km
|
220
|
Municipality education building
|
Barnaul
|
municipality — distance, km
|
0
|
Highways
|
M52 highways (1st category federal highway)
|
highways — distance, km
|
6
|
Railways
|
Barnaul railway station (within the city)
|
railways — distance, km
|
10
|
Airports
|
Barnaul International Airport
|
airports — distance km
|
15
|
River ports, landing stages
|
Barnaul river port (within the city)
|
river ports, landing stages — distance, km
|
4
|
FACILITIES
|
Number of structures
|
1
|
OWN TRANSPORT FACILITIES
|
Communication type (motorway)
|
yes
|
Communication type (railway branch)
|
yes
|
Communication type (port, landing stage)
|
yes
|
Communication type (post/telecommunications
|
yes
|
Additional information on site
|
M52 highway (1st category) runs to the left from the site. The river port is within the limits of the site, the railway station is close to the site boundary.
|
BUILDING
|
Residential development
|
5603000 sq. m
|
Commercial development, total
|
2053000 sq. m
|
PROJECT INVESTMENT COSTS
|
Concept development design
|
yes
|
Preparation of design and estimate documentation (
|
yes
|
Preparation of design and estimate documentation (
|
yes
|
Preparation of design and estimate documentation (
|
yes
|
Preparation of design and estimate documentation (
|
no
|
Preparation of design and estimate documentation (
|
no
|
Expert examination of design and estimate document
|
no
|
Execution of construction and assembly works
|
yes
|
Supervision of construction and assembly works
|
yes
|
Financial consultants’ services
|
yes
|
Repayment of interest on credit
|
no
|
Project costs (office services, sales, salaries)
|
yes
|
CONTRACTORS
|
General designer
|
OAO Altaigrazhdanproyekt
|
General contractor
|
OOO Zhillishnaya Initsiativa
|
Supervision of construction and assembly works
|
Executive bodies of Barnaul city
|
ECONOMIC INDICATORS
|
Revenue from sales of areas (RUR, millions)
|
227000
|
Discount rate, %
|
10
|
Shareholders' own resources (%)
|
80
|
Òðåáóåìûé îáúåì èíâåñòèöèéBorrowed resources (%)
|
20
|
Payback time, years
|
20
|